鋼波紋管和高強(qiang)度螺栓、螺母,出(chu)廠(chang)前有必(bi)要(yao)進行熱(re)鍍鋅防腐處(chu)理。每走(zou)一批貨都查驗(yan)并附產品合格證(zheng)。施(shi)工(gong)準(zhun)備(bei)施(shi)工(gong)所需鋼波紋管由工(gong)廠(chang)規范化(hua)消費后(hou)運送(song)施(shi)工(gong)現場(chang),間斷(duan)現場(chang)拼(pin)裝,管節設備(bei)位終了后(hou)回填。整個流程包含:根底(di)的(de)開挖、現場(chang)的(de)拼(pin)裝、回填三(san)個階段。
Before leaving factory, it is necessary to carry out hot-dip galvanizing anti-corrosion treatment for steel bellows, high-strength bolts and nuts. Every shipment is inspected and attached with product certificate. The steel bellows required for construction preparation are transported to the construction site after standardized consumption by the factory, assembled intermittently on site, and backfilled after the end of pipe joint equipment position. The whole process includes three stages: excavation of foundation, assembly on site and backfilling.
因為卷好的金屬波紋涵管長度較長,體積較大,一般是工程單位向廠方提規格、數量,由廠方帶設備及材料到施工現場加(jia)工。這樣既可大(da)大(da)減(jian)少波(bo)紋管(guan)的損耗(短頭(tou)、碰(peng)傷、銹蝕(shi)等),又(you)能滿足需方的各項要求(qiu),并(bing)節約經(jing)費。金屬(shu)波(bo)紋管(guan)現場卷(juan)制好后。
應存(cun)放在千燥場所,下面用檔距為1.6m的(de)(de)木板多檔架空,上面掩蓋防(fang)雨油布等隱瞞物,堆(dui)積高度(du)不(bu)宜超越7m。與圓管涵(han)比較,波紋管涵(han)的(de)(de)管側水平位移、撓度(du)和對(dui)路途的(de)(de)擾動(dong)小,有(you)(you)利于維護路面。管內切向與軸(zhou)向應力應變(bian)以及撓度(du)和大等效應力在恒載作用時隨填土高度(du)的(de)(de)增加有(you)(you)呈線性增加的(de)(de)規則(ze)。
活(huo)載作用時隨填土(tu)的高度增加逐(zhu)漸減小;總體上切向(xiang)應變力應變大值大于軸向(xiang)大值;管頂以切向(xiang)應變為(wei)主(zhu)。金屬波紋(wen)(wen)管在運送(song)、裝卸過(guo)程中,都(dou)要分外留神。不能翻滾(gun)或磕(ke)碰硬(ying)物,防止波紋(wen)(wen)管壁變形或損傷鍍鋅層。
鋼波紋管(guan)的(de)運送與設備(bei)鋼波紋管(guan)通常(chang)選用(yong)工廠規范化消費,出廠時已間斷鍍鋅處置。用(yong)汽車(che)運送工地(di)后(hou),卸貨時不(bu)可直接翻拉(la),使用(yong)吊車(che)合作人工間斷裝(zhuang)卸,防止損壞鍍鋅層。操作關鍵運到工地(di)后(hou),有必(bi)要每塊(kuai)查(cha)看(kan)尺度,并從(cong)金屬波紋管(guan)中隨(sui)機抽取一(yi)片板件、高強螺(luo)栓。
然后進行尺度、防腐、強度等項目的查驗。查驗數據應滿足相關要求。施工放樣涵洞施工前要片面熟諳規劃文件和規劃技術交底,現場核對涵洞的立體位置和角度,如有成績及時提出,施工便道建筑結束并能滿足施工需求。//hanihanbj.com/