鋼波紋管先從(cong)軸向(xiang)用M4螺(luo)釘(ding)(ding)固定在定位(wei)環上(shang)(shang),再用m螺(luo)釘(ding)(ding)從(cong)直徑(jing)(jing)方(fang)向(xiang)將定位(wei)環固定在軸套(tao)上(shang)(shang),這樣就存在累(lei)計誤差,不易確保鋼波紋管(guan)端面(mian)垂直于軸套(tao)。壓(ya)蓋上(shang)(shang)沖(chong)刷(shua)油和冷卻水(shui)注入孔(kong)位(wei)置(zhi)不合理,冷卻水(shui)的通徑(jing)(jing)有一半孔(kong)被靜環密封圈擋住。
The steel bellows is fixed on the locating ring with M4 screw from the axial direction, and then the locating ring is fixed on the shaft sleeve with m screw from the diameter direction, so there is accumulated error, and it is not easy to ensure that the end face of the steel bellows is perpendicular to the shaft sleeve. The location of flushing oil and cooling water injection hole on the gland is unreasonable, and half of the cooling water diameter hole is blocked by the static ring seal ring.
形成(cheng)靜環冷卻水減少,密封(feng)(feng)面冷卻效果不好;沖刷(shua)油(you)孔離(li)動、靜環密封(feng)(feng)面太遠(軸(zhou)向間(jian)隔太長),使沖刷(shua)油(you)不易注入到鋼波紋(wen)管密封(feng)(feng)處。直(zhi)徑偏(pian)小(xiao)鋼波紋(wen)管內徑62mm,密封(feng)(feng)比壓偏(pian)大;軸(zhou)徑為55mm,軸(zhou)套外徑為60mm,壁(bi)厚僅(jin)為2.5mm,壁(bi)厚偏(pian)小(xiao),簡單變形,形成(cheng)拆(chai)、裝困難。
用戶(hu)柜(ju)子中心的(de)孔(kong)的(de)直徑≥2.5cm,由于金屬管(guan)(guan)兩側(ce)的(de)接(jie)頭比中心軟(ruan)管(guan)(guan)厚,而且用戶(hu)柜(ju)子的(de)一些眼睛(jing)僅夠假如裝置要(yao)(yao)求用戶(hu)事前打孔(kong)或重(zhong)新打孔(kong)以方便波紋管(guan)(guan)穿(chuan)過則(ze)軟(ruan)管(guan)(guan)要(yao)(yao)經過。一些用戶(hu)原來(lai)的(de)天然氣界面十(shi)分接(jie)近大理(li)石臺面。
金屬管界面需要(yao)具有程(cheng)度的曲率,較(jiao)小曲折(zhe)面積(ji)≥30mm。假(jia)如曲率小于(yu)上述大小,則無法暫時裝(zhuang)置。該界面位于(yu)用戶家的一角,而(er)且被單獨阻止。存在潛在的安全隱患,需要(yao)在裝(zhuang)置前進(jin)行糾正(zheng)。請檢查接頭(tou)是否別離卡住以及是否能夠運用扳手(扳手長度為(wei)20cm)。
鋪裝于壩基下的金屬波紋管的管身要設定預埋拱度,其尺寸革命老區基土很有或許出現的下移量,涵底橫坡和回填土高寬比等要素綜合性考慮到,一般能為長度的百分之零點六到百分,不適合超越百分之二,以確保管路中心不出現凹現或山體滑坡。//hanihanbj.com/
分享此文章: |
版權所有:衡水浩(hao)威(wei)新材(cai)料(liao)有限公司 ICP備案/許(xu)可(ke)證號: 技術(shu)支持(chi):