色综合久久88色综合天天_韩日美无码精品无码_插一插射一射视频_国产情侣久久久久aⅴ免费

衡水(shui)浩威新材料有(you)限公(gong)司(si)主營產品:鋼(gang)波紋(wen)管、鋼(gang)波紋(wen)涵(han)管

南充鋼波紋管的工藝流程圖閃現

瀏覽:15692 發布日期:2021-07-07

鋼波紋管和(he)高強度螺栓、螺母,出廠前有必要進行熱鍍鋅防腐處理。每走一批貨都查驗并附產品(pin)合格證。施工(gong)(gong)準備(bei)施工(gong)(gong)所需(xu)鋼波紋管由(you)工(gong)(gong)廠規范化消(xiao)費(fei)后運送施工(gong)(gong)現場(chang),間斷現場(chang)拼裝(zhuang),管節設備(bei)位(wei)終(zhong)了后回(hui)填。整個流程包(bao)含:根(gen)底的(de)開挖、現場(chang)的(de)拼裝(zhuang)、回(hui)填三個階段。

Before leaving factory, it is necessary to carry out hot-dip galvanizing anti-corrosion treatment for steel bellows, high-strength bolts and nuts. Every shipment is inspected and attached with product certificate. The steel bellows required for construction preparation are transported to the construction site after standardized consumption by the factory, assembled intermittently on site, and backfilled after the end of pipe joint equipment position. The whole process includes three stages: excavation of foundation, assembly on site and backfilling.

鋼波紋管

鋼波紋管

因為卷好的金屬波紋涵管長度較長,體積較大,一般是工程單位向廠方提規格、數量,由廠方帶設備及材料到施工現(xian)場加(jia)工。這樣(yang)既可(ke)大大減少(shao)波(bo)紋(wen)管(guan)的損耗(短頭、碰傷(shang)、銹蝕等),又能滿足需方(fang)的各項要求,并節約(yue)經(jing)費。金屬(shu)波(bo)紋(wen)管(guan)現(xian)場卷制(zhi)好后。

應存放在(zai)千燥場所,下面用檔距(ju)為1.6m的(de)(de)木板(ban)多檔架空,上面掩(yan)蓋(gai)防(fang)雨油布等隱瞞物,堆積(ji)高度(du)(du)不宜超越7m。與(yu)圓(yuan)管涵比較,波(bo)紋管涵的(de)(de)管側水平(ping)位移、撓度(du)(du)和(he)對路途的(de)(de)擾(rao)動(dong)小,有(you)利于維護(hu)路面。管內切向與(yu)軸向應力應變以及(ji)撓度(du)(du)和(he)大等效應力在(zai)恒載作用時隨(sui)填土高度(du)(du)的(de)(de)增加(jia)有(you)呈線性增加(jia)的(de)(de)規則(ze)。

鋼波紋管

鋼波紋管

活(huo)載作用時(shi)隨填土的(de)高度增加(jia)逐漸減小;總體上切向(xiang)應變(bian)力應變(bian)大(da)(da)值大(da)(da)于軸向(xiang)大(da)(da)值;管(guan)頂以切向(xiang)應變(bian)為主。金屬波紋(wen)管(guan)在運送、裝(zhuang)卸過(guo)程中,都(dou)要分外留神。不(bu)能(neng)翻滾或(huo)磕碰硬(ying)物,防止波紋(wen)管(guan)壁變(bian)形或(huo)損傷(shang)鍍鋅(xin)層。

鋼(gang)波(bo)(bo)紋管(guan)的運(yun)送與設備(bei)鋼(gang)波(bo)(bo)紋管(guan)通常選用(yong)工廠(chang)規范化消費,出(chu)廠(chang)時已間(jian)斷(duan)鍍鋅處置(zhi)。用(yong)汽車運(yun)送工地后,卸貨時不可直接(jie)翻拉,使用(yong)吊車合作人工間(jian)斷(duan)裝卸,防止損壞鍍鋅層(ceng)。操作關鍵運(yun)到工地后,有必要每塊查看尺度,并從金(jin)屬波(bo)(bo)紋管(guan)中隨機抽(chou)取(qu)一片板件(jian)、高強螺栓。

然后進行尺度、防腐、強度等項目的查驗。查驗數據應滿足相關要求。施工放樣涵洞施工前要片面熟諳規劃文件和規劃技術交底,現場核對涵洞的立體位置和角度,如有成績及時提出,施工便道建筑結束并能滿足施工需求。//hanihanbj.com/

[返回]   
分享此文章:

版權(quan)所有:衡(heng)水(shui)浩威新材料有限公(gong)司   ICP備案/許(xu)可證號:   技術支持(chi):