鋼波紋管和(he)高強度螺栓、螺母,出(chu)廠(chang)前有必要進行熱(re)鍍鋅防腐處理。每走(zou)一批貨都查驗并附產品合格證。施工(gong)準(zhun)備施工(gong)所需鋼波紋管(guan)由工(gong)廠(chang)規范化消費后(hou)運送施工(gong)現場(chang),間斷現場(chang)拼裝,管(guan)節設備位終了后(hou)回填。整個流程包含(han):根底的開挖(wa)、現場(chang)的拼裝、回填三個階段。
Before leaving factory, it is necessary to carry out hot-dip galvanizing anti-corrosion treatment for steel bellows, high-strength bolts and nuts. Every shipment is inspected and attached with product certificate. The steel bellows required for construction preparation are transported to the construction site after standardized consumption by the factory, assembled intermittently on site, and backfilled after the end of pipe joint equipment position. The whole process includes three stages: excavation of foundation, assembly on site and backfilling.
因為卷好的金屬波紋涵管長度較長,體積較大,一般是工程單位向廠方提規格、數量,由廠方帶設備及材料到施工現場(chang)加工。這樣既(ji)可大大減少波紋(wen)管的(de)損耗(短頭、碰傷、銹蝕等),又能滿足需(xu)方的(de)各項要求,并節約經(jing)費。金(jin)屬波紋(wen)管現場(chang)卷制好后。
應(ying)(ying)存放(fang)在千(qian)燥場所,下面(mian)用檔距為1.6m的(de)木板多檔架空,上面(mian)掩蓋防雨油布等隱瞞(man)物,堆積(ji)高度(du)不宜超越7m。與圓(yuan)管涵比較,波紋管涵的(de)管側(ce)水平位移、撓度(du)和(he)對路途的(de)擾動小,有利(li)于維護路面(mian)。管內切向(xiang)與軸向(xiang)應(ying)(ying)力(li)應(ying)(ying)變以及撓度(du)和(he)大等效應(ying)(ying)力(li)在恒(heng)載作用時隨填(tian)土高度(du)的(de)增加有呈線性增加的(de)規則。
活載作用時隨填土的高(gao)度增加逐漸(jian)減小;總體(ti)上切(qie)向應變力應變大值大于軸向大值;管(guan)頂(ding)以切(qie)向應變為主(zhu)。金屬波(bo)(bo)紋(wen)管(guan)在(zai)運送、裝卸(xie)過程中,都要分外(wai)留(liu)神。不能(neng)翻滾或(huo)磕碰硬(ying)物,防止(zhi)波(bo)(bo)紋(wen)管(guan)壁變形或(huo)損傷鍍鋅層。
鋼波(bo)紋管的運(yun)(yun)送(song)與設備鋼波(bo)紋管通常(chang)選用(yong)(yong)工廠規(gui)范(fan)化消費,出廠時已間(jian)斷鍍(du)鋅(xin)處置。用(yong)(yong)汽車(che)運(yun)(yun)送(song)工地后,卸(xie)貨時不可直接(jie)翻拉,使用(yong)(yong)吊車(che)合作人工間(jian)斷裝卸(xie),防止(zhi)損壞鍍(du)鋅(xin)層。操作關鍵運(yun)(yun)到工地后,有必要(yao)每塊查看尺度,并從(cong)金屬波(bo)紋管中隨(sui)機抽取一片板(ban)件(jian)、高強螺栓。
然后進行尺度、防腐、強度等項目的查驗。查驗數據應滿足相關要求。施工放樣涵洞施工前要片面熟諳規劃文件和規劃技術交底,現場核對涵洞的立體位置和角度,如有成績及時提出,施工便道建筑結束并能滿足施工需求。//hanihanbj.com/