色综合久久88色综合天天_韩日美无码精品无码_插一插射一射视频_国产情侣久久久久aⅴ免费

衡水(shui)浩(hao)威新材料有限公司主營產品(pin):鋼波(bo)紋(wen)管(guan)、鋼波(bo)紋(wen)涵(han)管(guan)

南陽鋼波紋管的工藝流程圖閃現

瀏覽:15688 發布日期:2021-07-07

鋼波紋管和高強度螺栓(shuan)、螺母,出廠(chang)前有(you)必要進(jin)行熱鍍(du)鋅防腐處理。每走一批貨都(dou)查(cha)驗并附產品合格證(zheng)。施工準備施工所需鋼波紋管由工廠(chang)規范(fan)化消(xiao)費后(hou)運送施工現場,間斷現場拼(pin)裝,管節設(she)備位(wei)終了后(hou)回填。整個流程包含:根底的(de)開挖(wa)、現場的(de)拼(pin)裝、回填三(san)個階段(duan)。

Before leaving factory, it is necessary to carry out hot-dip galvanizing anti-corrosion treatment for steel bellows, high-strength bolts and nuts. Every shipment is inspected and attached with product certificate. The steel bellows required for construction preparation are transported to the construction site after standardized consumption by the factory, assembled intermittently on site, and backfilled after the end of pipe joint equipment position. The whole process includes three stages: excavation of foundation, assembly on site and backfilling.

鋼波紋管

鋼波紋管

因為卷好的金屬波紋涵管長度較長,體積較大,一般是工程單位向廠方提規格、數量,由廠方帶設備及材料到施工現場加工。這(zhe)樣(yang)既可(ke)大(da)(da)大(da)(da)減少波紋管的(de)損耗(短頭、碰傷(shang)、銹蝕(shi)等(deng)),又能滿(man)足需方的(de)各(ge)項要(yao)求(qiu),并節約經費。金屬波紋管現場卷制好后。

應存放(fang)在(zai)千燥場所(suo),下面用檔距為1.6m的(de)(de)木板多檔架空,上面掩(yan)蓋防雨油(you)布(bu)等隱瞞物,堆積(ji)高度不宜(yi)超越7m。與(yu)圓管(guan)涵比較,波紋管(guan)涵的(de)(de)管(guan)側(ce)水(shui)平位移、撓(nao)度和對路途的(de)(de)擾(rao)動小,有利于(yu)維(wei)護路面。管(guan)內切向與(yu)軸向應力(li)應變以及(ji)撓(nao)度和大等效(xiao)應力(li)在(zai)恒載作(zuo)用時隨填土高度的(de)(de)增(zeng)加(jia)有呈(cheng)線性增(zeng)加(jia)的(de)(de)規則。

鋼波紋管

鋼波紋管

活載作(zuo)用時隨填(tian)土的高度增加(jia)逐漸(jian)減(jian)小;總(zong)體上切向應(ying)(ying)變(bian)(bian)(bian)力(li)應(ying)(ying)變(bian)(bian)(bian)大值(zhi)(zhi)大于軸(zhou)向大值(zhi)(zhi);管(guan)頂以切向應(ying)(ying)變(bian)(bian)(bian)為主(zhu)。金(jin)屬波紋(wen)管(guan)在運(yun)送(song)、裝卸過(guo)程(cheng)中,都要分外留神。不能翻(fan)滾或磕碰硬物,防(fang)止(zhi)波紋(wen)管(guan)壁變(bian)(bian)(bian)形或損傷(shang)鍍(du)鋅層。

鋼波紋管的運送(song)與設備(bei)鋼波紋管通常(chang)選用(yong)工(gong)(gong)廠(chang)規(gui)范化消費,出廠(chang)時(shi)已間斷鍍鋅處置。用(yong)汽車運送(song)工(gong)(gong)地后,卸貨(huo)時(shi)不可直接翻(fan)拉,使(shi)用(yong)吊車合作(zuo)(zuo)人工(gong)(gong)間斷裝卸,防止損壞鍍鋅層。操作(zuo)(zuo)關鍵運到工(gong)(gong)地后,有必要每(mei)塊查看尺(chi)度,并從金屬波紋管中隨(sui)機(ji)抽取一片板件、高(gao)強螺栓。

然后進行尺度、防腐、強度等項目的查驗。查驗數據應滿足相關要求。施工放樣涵洞施工前要片面熟諳規劃文件和規劃技術交底,現場核對涵洞的立體位置和角度,如有成績及時提出,施工便道建筑結束并能滿足施工需求。//hanihanbj.com/

[返回]   
分享此文章:

版(ban)權所有(you):衡水浩(hao)威新材料有(you)限(xian)公(gong)司   ICP備案/許可證號(hao):   技術支(zhi)持: