鋼波紋管和高強度螺(luo)栓、螺(luo)母,出廠前有必要進行熱鍍鋅防腐處理(li)。每(mei)走一批(pi)貨都(dou)查驗并附產品合格(ge)證。施(shi)工(gong)準備(bei)施(shi)工(gong)所(suo)需鋼波(bo)紋管由工(gong)廠規范(fan)化消費后運送施(shi)工(gong)現場(chang),間斷現場(chang)拼(pin)裝,管節設備(bei)位終了(le)后回填。整個(ge)流程包含:根底的開挖、現場(chang)的拼(pin)裝、回填三(san)個(ge)階(jie)段。
Before leaving factory, it is necessary to carry out hot-dip galvanizing anti-corrosion treatment for steel bellows, high-strength bolts and nuts. Every shipment is inspected and attached with product certificate. The steel bellows required for construction preparation are transported to the construction site after standardized consumption by the factory, assembled intermittently on site, and backfilled after the end of pipe joint equipment position. The whole process includes three stages: excavation of foundation, assembly on site and backfilling.
因為卷好的金屬波紋涵管長度較長,體積較大,一般是工程單位向廠方提規格、數量,由廠方帶設備及材料到施工現場加工。這樣既可大大減少波(bo)紋(wen)管(guan)的損(sun)耗(短頭、碰傷(shang)、銹(xiu)蝕等),又(you)能滿(man)足需(xu)方(fang)的各項要求,并節(jie)約經費。金屬(shu)波(bo)紋(wen)管(guan)現場卷制好后(hou)。
應(ying)存放在千燥場所,下面用檔(dang)距為1.6m的(de)木板(ban)多檔(dang)架空,上(shang)面掩蓋防雨油布等隱瞞物,堆(dui)積高度不宜超越(yue)7m。與(yu)圓管(guan)涵比較,波紋(wen)管(guan)涵的(de)管(guan)側水平位移、撓度和對路途(tu)的(de)擾動小,有(you)利(li)于(yu)維護路面。管(guan)內切向與(yu)軸向應(ying)力(li)應(ying)變以及撓度和大等效應(ying)力(li)在恒載(zai)作用時隨(sui)填土高度的(de)增加有(you)呈線性增加的(de)規(gui)則。
活載作用時(shi)隨填土的高度增(zeng)加逐漸減小;總體上切向應變(bian)力(li)應變(bian)大值大于軸向大值;管(guan)頂以(yi)切向應變(bian)為主。金屬波紋管(guan)在運(yun)送、裝卸過程中,都要(yao)分外留(liu)神。不能(neng)翻滾或磕碰硬(ying)物(wu),防止波紋管(guan)壁(bi)變(bian)形或損(sun)傷鍍鋅層。
鋼波紋管的(de)運送(song)與設(she)備鋼波紋管通(tong)常選用工(gong)廠(chang)規范化消費,出廠(chang)時已(yi)間斷(duan)鍍(du)鋅處置。用汽(qi)車運送(song)工(gong)地后,卸貨時不可直接翻拉,使用吊(diao)車合作人工(gong)間斷(duan)裝卸,防止(zhi)損壞鍍(du)鋅層。操作關鍵運到(dao)工(gong)地后,有必(bi)要每塊查看尺度,并(bing)從金屬(shu)波紋管中隨機抽取一片板件、高強(qiang)螺栓。
然后進行尺度、防腐、強度等項目的查驗。查驗數據應滿足相關要求。施工放樣涵洞施工前要片面熟諳規劃文件和規劃技術交底,現場核對涵洞的立體位置和角度,如有成績及時提出,施工便道建筑結束并能滿足施工需求。//hanihanbj.com/
分享此文章: |
版權所有:衡(heng)水(shui)浩威新材(cai)料有限(xian)公司 ICP備案/許可(ke)證號(hao): 技術(shu)支持: